EasyManua.ls Logo

Hytera HR106X - Installation; Installation Requirements; Pre-installation Tasks; Installation Procedure

Hytera HR106X
27 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7
3. Installation
To ensure optimum performance and reliability of the repeater, read the following instructions carefully.
3.1 Installation Requirements
3.1.1 Environmental Conditions
The repeater must be installed in a dry and well-ventilated place. The operating temperature ranges from 30°C to
+60°C, and the relative humidity is 95%.
3.1.2 Installation Site
The repeater can be installed in a rack, bracket, and cabinet, or on a desk.
For more information, refer to the Safety Information Booklet.
3.2 Pre-installation Tasks
3.2.1 Preparing the Tools
Phillips screwdriver
T-10 torx screwdriver
Spanner
Anti-static gloves
Multimeter
3.2.2 Checking the Power Supply
Before you install the repeater, make sure that the power supply meets the following requirements:
DC power voltage: 13.6±15% V
AC power voltage: 100240 V
3.3 Installation Procedure
To install the repeater, do as follows:
1. Wear the anti-static gloves.
2. Place the repeater to a proper location.

Other manuals for Hytera HR106X

Related product manuals