EasyManua.ls Logo

IBC SL 26-260 G3 - Page 33

IBC SL 26-260 G3
88 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1-25
INSTALLATION
SL 26-260 G3, SL 40-399 G3 MODULATING GAS BOILERS
Compared with the Primary/Secondary approach, the above design saves one pump. Lost
is the simplicity of constant head and ow at the boiler.
Check valves or thermal traps should be used to isolate both the supply and return piping
for each load - to avoid thermal siphoning and reverse ow.
To ensure adequate water ow through the boiler under high-head / single zone space
heating conditions, a pressure activated bypass or other means of bypass must be used
on any load where the ow rate might drop below minimum requirements (20 gpm).
For further information and details, consult our Application Notes – which provide detail on
specic single and multiple boiler applications “Piping”, “Wiring” and “Settings”. (available
at www.ibcboiler.com or from your IBC Representative).

Table of Contents

Other manuals for IBC SL 26-260 G3

Related product manuals