IBERITAL DE RECAMBIOS, S.A.
Heating type
xxxxxxx
Pressure Switch
Xxxxxxx On / off
PID
The display will show the “SERVICE CYCLES” option. Press to select the
number of cycles (number of times that you have pushed a dosing button).
Once you have finished this procedure, press MENU button to pass to the following option:
The display will show the HEATING CONTROL SYSTEM of the machine.
• Pressure Switch. Boiler temperature control through the boiler pressure.
• On / Off: Boiler temperature control through a temperature probe, with histeresis 0,5ºC,
1ºC or 2ºC. (Temperature variation GAP).
• PID: Boiler temperature control through a temperature probe, with variation of the
algorithm constants: Kp, Ki, Kd.
Filling up – T-out
xxxxxxx
Water filter
xxxxxxx
IMPORTANT: THE “HEATING TYPE” OPTION HAVE TO BE “
Pressure Switch
”
FOR THIS MODEL (IBERITAL).
Once you have finished this procedure, press MENU button to pass to the following option:
The display will show the option of maximum “FILLING UP TIME”, from this time will jump
the Alarm-warning of Time-out. When you are filling up the machine for the first time, this
alarm will appear. In this case, in order to continue the filling up process, turn off the general
power switch (position 0) and following turn on the general power switch to position 1, in order
to allow the filling up process.
Press buttons in order to select the maximum filling-up time in seconds. (from 10
sec, . until 250 s ,by 1 sec.).
Once you have finished this procedure, press MENU button to pass to the following option:
MANUAL NEW IBERITAL INGLES Página 20 de 30
11/05/2007