BASIC OPERATION
4
8
■ Checking the installation
Before turning the power ON, be sure all the connec-
tions are complete. The checklist at right may be help-
ful for necessary confirmation.
D Checklist
q The 4 bolts securing the scanner unit must be firmly
tightened.
w Cabling must be securely attached to a mast or
mounting material, and must not interfere with the
rigging.
e Be sure waterproofing procedures are completed
on the system cable.
r The power connections to the battery must be of the
correct polarity.
t Be sure that the plugs at the rear of the display unit
have been connected correctly and securely.
(See p. 24 for details.)
CAUTION:
Connect the scanner unit before turning the
power ON. Otherwise the magnetron inside the scanner
unit might be damaged.
■ Turning power ON/OFF
q Push [POWER]/[ ] to turn the power ON.
• The initial screen appears and warming up time is
counted down on the screen.
•
The magnetron inside the scanner unit warms up for 90 sec.
• [POWER]/[]does not function for 2 sec. after
the power is turned OFF.
w When the countdown is completed, the Standby
screen appears.
e Push [TX]/[ ] to start scanning and select
the Plan Position Indicator (PPI) screen.
• Targets and heading marker appear.
• The screen appears approx. 2 sec. after turning the
power on, when ‘AUTO’ is selected in the “TUNE” of the
VIDEO menu.
r Push [POWER]/[ ] to turn the power OFF.