EasyManua.ls Logo

Ideal Heating LOGIC+ SYSTEM S18 - Water Pressure Switch Replacement; Control; no Flow Thermistor Replacement

Ideal Heating LOGIC+ SYSTEM S18
72 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
49
Installation and Servicing
SECTION 3 - SERVICING
3.25 CH WATER PRESSURE SWITCH REPLACEMENT
1. Refer to Section 3.9.
2. Drain the boiler. Refer to Section 3.20.
3. Pull off the two electrical connections.
4. Using a suitable tool, pull out the metal
retaining clip.
5. Carefully withdraw the pressure switch.
6. Fit the new pressure switch and re-
assemble in reverse order.
7. Rell the boiler.
8. Check operation of the boiler. Refer to
Sections 2.25 & 2.26.
1. Refer to Section 3.9.
2. Drain down the boiler. Refer to Section 3.20.
3. Unplug the electrical lead.
4. Unscrew the thermistor (to facilitate removal a
13mm socket spanner should be used).
5. Fit the new thermistor using the sealing
washer provided.
6. Reassemble in the reverse order.
7. Rell the boiler. Refer to Section 2.19.
8. Check the operation of the boiler. Refer to
Sections 2.25 & 2.26.
3.26 CONTROL / NO FLOW THERMISTOR REPLACEMENT
4
3
3
4
5
SERVICING

Table of Contents

Related product manuals