The boiler is supplied fully assembled in Pack A.
outlet in Pack B is suppled as a separate order.
Unpack and check the contents.
Pack A Contents
A The boiler
B These Installation & Servicing/User Instructions
C Floor standing template
11
UNPACKING
Pack B Contents
Flue terminal
1.
sleeve.
2. The Installation & Servicing/Users
Instructions can be found on top of the
boiler.
3. Remove wood screw at bottom rear of
boiler, retaining the hardware pack box
and remove box.
4.
piping Frame (refer to Frame 21) remove
the top and inner sleeve and the boiler
from its wooden base.
The inner sleeve can be used to protect
the oor when tting the boiler to the
pre-piping frame.
1.
into place.
Note.
The template gives positions for both wall
or ush with 600mm deep kitchen
units and the positional options
of the condensate pipe bracket
dependant upon boiler size. To
facilitate upward routing of
pipework behind boiler,
position the template
40mm (minimum) away
from the back wall.
2.
template, mark
the pre-piping
3.
piping frame in place.
4.
short piece of plastic pipe to the bracket and mark the wall for drilling. Refer
to Frame 15 for condensate drain detail. When complete retain condensate
5.
Note. Measure and cut out ue hole using template (Refer to Frame 14).
12
PACKAGING REMOVAL
13
FITTING AND CONNECTING THE PRE-PIPING