15
1-19 1-20
B23
1-21
B23 B23
1-22
1
2
3
4
1
2
3
B23
INSTALLERUSER
MAINTENANCE TECHNICIAN
e kit includes:
N° 1 - Bend 90° Ø 80 (1)
N° 1 - 80 Ø exhaust terminal (2)
N° 1 - Internal ring (3)
N° 1 - External ring (4)
1.17 INSTALLATION OF 80 Ø
HORIZONTAL TERMINALS.
Configuration type B, open chamber and
forced draught.
Ø 80 horizontal kit with wall ue exhaust.
Kit assembly (Fig. 1-19): install the 80 Ø bend (1)
with the male side (smooth) fully home on the
central hole of the boiler. Fit the exhaust terminal
(2) with the male end (smooth) to the female
end of the bend (1) up to the stop; making sure
that the internal (3) and external (4) wall sealing
plate has been tted. is will ensure sealing and
joining of the elements making up the kit.
Horizontal kit Ø 80 with exhaust in ue. Kit
assembly (Fig. 1-21): install the 80 Ø bend (1)
with the male side (smooth) fully home on the
central hole of the boiler. Fit the exhaust pipe (2)
with the male end (smooth) to the female end of
the bend (1) up to the stop; making sure that the
internal wall sealing plate (3) has been tted. is
will ensure sealing and joining of the elements
making up the kit.
• Maximum length (MAX L) (Fig. 1-20 and 22).
e kit with this conguration can be extended
up to a max. measurement of 24.0 m with Victrix
Pro 35 2ErP and 30.0 m with Victrix Pro 55
2ErP, including the terminal.
e kit includes:
N° 1 - 90° 80 Ø bend (1)
N° 1 - 80 Ø drain pipe (2)
N° 1 - Internal ring (3)
Minimum gradient 1.5 %
MAX