EasyManua.ls Logo

Immergas VICTRIX PRO 35 2ErP - 3 Boiler Commissioning Initial Check; Hydraulic Diagram

Immergas VICTRIX PRO 35 2ErP
48 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
27
3-1
INSTALLERUSER
MAINTENANCE TECHNICIAN
3
BOILER COMMISSIONING
INITIAL CHECK
To commission the boiler:
- make sure that the declaration of conformity
for installation is supplied with the appliance;
- make sure that the type of gas used corresponds
to boiler settings;
- check connection to a 230V-50Hz power
mains, correct L-N polarity and the earthing
connection;
- switch the boiler on and check correct ignition;
- check the CO
2
in the fumes at maximum and
minimum ow rate;
- make sure the fan rpm matches the value pro-
vided in the book (Par. 3.23);
- check activation of the safety device in the event
of no gas, as well as the relative activation time;
- check the intervention of the main switch
located upstream of the boiler and in the boiler;
- check the existing draught during normal
functioning of the appliance, e.g. a draught
gauge positioned at the exit of the appliance
combustion products;
- check that there is no backow of combustion
products into the room, even during function-
ing of fans;
- check that the intake and/or exhaust terminals
are not blocked;
- ensure activation of all adjustment devices;
- seal the gas ow rate regulation devices (if
settings are modied);
- check sealing eciency of water circuits;
- check ventilation and/or aeration of the instal-
lation room where provided.
If even only a single safety check oers a negative
result, do not commission the system.
3.1 HYDRAULIC DIAGRAM.
Key:
1 - Draining funnel on view
2 - Boiler draining valve
3 - 4 bar safety valve
4 - Flow manifold
5 - Condensate trap siphon
6 - Gas valve
7 - Gas nozzle
8 - Air fan
9 - Manifold cover
10 - Ignition electrode
11 - Condensation module cover
12 - Condensation module
13 - Flue probe
14 - Condensing module air vent valve
15 - ermofuse
16 - Air sample point
17 - Flue sample point
18 - Venturi positive sign (P2)
19 - Fumes hood
20 - Heat-exchanger safety thermostat
(manual reset)
21 - Over temperature safety thermostat
22 - System return regulation probe
23 - System ow regulation probe
24 - Detection electrode
25 - System ow meter
26 - Burner
27 - Air intake pipe
28 - Sleeve with seats for Venturi
29 - Automatic vent valve
30 - Boiler circulator pump
M - System ow
SC - Condensate drain
G - Gas supply
R - System return

Table of Contents

Related product manuals