EasyManua.ls Logo

IN-COMMAND JRVCS2 - Component Control Configuration; Slide and Awning Setup; Jack and Trigger Setup

Default Icon
36 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
JRVCS2
14
Awnings can be added to the system.
• Awnings
Jacks can be added to the system.
• Jacks
Slides can be added to the system.
• Slides
Triggers can be added to the system. “Momentary” or “Latch” can
be selected for each Trigger. Note: Desired devices need to be
correctly wired to the BCM to function.
• Triggers

Related product manuals