Figure 6: Example of distances to maintain to create folds on the evaporator
5. Both the sucon hose and the small capillary hose should be rolled up carefully
before installing the evaporator, keeping the protecve covers on connecons
as long as the connecon is not going to be made. Starng from the inside of
the compartment to be cooled, lay the hose with its two connecons through
the hole made previously on the bulkhead unl reaching the compressor,
making sure not to crush or choke the hose. The excess hose must be carefully
wound in a spiral (Ø = 30 cm) before being fastened to thus prevent resulng
vibraon or noise. These acons must be completed before removing
quick coupling protecons. The hole on the unit wall must be sealed with
polyurethane foam or with insulang material.
6. Assemble the bending tool (SGH00008AA) on a work bench and fasten it with
two screws so that it remains staonary during bending operaons.
User Manual
70