Maintenance Summary - 2.000 Operating hours
It is recommended to document the maintenance activities carried out by using the appropriate
maintenance log. The maintenance log has the document number DIE249EN - 15.08.2022.
C010 - Check maintenance logs of servicing activities
C023 - Clean and check wipers of the work area door
C025 - Check work area door (with electr. drive) and window pane
C040 - Check and lubricate HSK clamping set (from Ott-Jakob)
C047 - Check tool clamping sets of the milling spindles
C050 - Check and potentially replace the cooling lubricant adapter (HSK tool mountings)
C065 - Check telescopic covers and wipers
C070 - Check outer wipers of linear guides
C080 - Check all electrical connections and drive belts of the drive motors
C095 - Check slat/shingle cover on the telescopes (visual inspection)
C130 - Replace filter on air conditioner cooling fan
C140 - Check cooling unit for cooling lubricant
C165 - Check coolant
C190 - Clean labyrinth rings of spindles
C510 - Check backup data carrier
C525 - Check control cabinet
C545 - Check cable and hose clamps for tight seating
C555 - Replace hydraulic fluid filters
C570 - Wassermann tool change system
C590 - Maintenance of turret steady rest SR2 or SLU X1 (by SMW)
Maintenance Summary - 2.000 Operating hours
52
Maintenance Instructions
G200.3 G220.3
DIE248EN - 15.08.2022