EasyManua.ls Logo

InnovaPrep CP Select - 6.4 PRIMING THE ELUTION FLUID; 6.5 PREPARING THE INSTRUMENT FOR TRANSPORT OR SHIPMENT

InnovaPrep CP Select
37 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Copyright 2018, InnovaPrep LLC Patented https://www.innovaprep.com/patents
20
Step 2 Follow the menu prompt: Remove Foam Can. Select Continue.
Step 3 Follow the menu prompt: Place Maintenance Tip into Tip Port. Select Continue.
Step 4 Follow the menu prompt: Insert Storage Fluid Line into Can Port. To do so, remove the orange cap from
the Storage Fluid Adapter and insert the tube fitting into the Canister Interface Port by pressing it firmly in place
(the fitting will only go in about 1/8
th
- inch). Select Continue. The fluid will rinse through the instrument to the
permeate.
Step 5 Follow the menu prompt: Power Off Unit or Restart. Leave the Maintenance Tip and Storage Fluid
Adapter in place for the entire time that the instrument is not in use. For long term storage it is recommended
that the orange rubber port cap that arrives with the instrument be used in place of the storage fluid. Instructions
for preparing the instrument for transport or shipment are provided below in Section 6.5.
6.4 PRIMING THE ELUTION FLUID
A manual elution fluid prime is required when installing a new Elution Fluid Canister. Its function is to purge the foam line
of air or any fluid that may have lost carbonation.
Step 1From the Main Menu select Maintenance>Prime.
Step 2 Follow the menu prompt: Place Maintenance Tip into Tip Port. Select Continue.
Step 3 Follow the menu prompt: Place Foam Can (Elution Fluid Canister) Into Position. Select Continue. Fluid
from the Canister will rinse through to permeate. The Run Protocol menu will be displayed upon completion so
use can be resumed.
6.5 PREPARING THE INSTRUMENT FOR TRANSPORT OR SHIPMENT
It is important to prepare the instrument before transporting or shipping the instrument, or for returning the instrument
for repair or service. The Shut Down procedure should first be performed to decontaminate the instrument. A modified
second Shut Down procedure is then performed to flush the Storage Fluid from the system.
Step 1 From the Main Menu select Maintenance>Shut Down.
Step 2 Follow the menu prompt: Remove Foam Can. Select Continue.
Step 3 Follow the menu prompt: Place Maintenance Tip into Tip Port. Select Continue.
Step 4 Follow the menu prompt: Insert Storage Fluid Line into Can Port. To do so, remove the orange cap from
the Storage Fluid Adapter and insert the tube fitting into the Canister Interface Port by pressing it firmly in place
(the fitting will only go in about 1/8
th
- inch). Select Continue. The fluid will rinse through the instrument to the
permeate.
Step 5 At the menu prompt: Power Off Unit or Restart. Leave the Maintenance Tip and Storage Fluid Adapter
in place and Power Off the unit.
Step 6 Allow the instrument to sit for 30 minutes to ensure complete decontamination of the fluidics.

Related product manuals