EasyManua.ls Logo

Intertek MBU 400 - Monitoring Time

Default Icon
74 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INTERTEK TESTING SERVICES
Test Report Number: HK08060834-1 Page 48 of 72
FCC ID: T7HCT8015
Company: RTX Consumer Products Hong Kong Ltd. Date of Test: June 24-July 7, 2008
Model: MBU 400
4.18 Monitoring Time, FCC Rule 15.323(c)(1):
Immediately prior to initiating transmission, EUT must monitor the combined time and
spectrum windows in which they intend to transmit for a period of at least 10 ms for
EUT designed to use a 10 ms or shorter frame period, or at least 20 ms for EUT
designed to use a 20 ms frame period.
Measurements are made in accordance with ANSI C63.17 sub-clause 7.3.4. Test setup is
shown in section 3.3 Figure 3.3.1. RF signal generators apply uniform CW interference on
all system carriers except two carriers (designated f
1
and f
2
), each at level T
U
+ U
M.
EUT
can only transmit on these two carriers.
Test Descriptions and Results:
Test Descriptions EUT transmits on Results
1
Apply interference on f
1
at level T
U
+ U
M
, and no
interference on f
2.
Initiate transmission. Verify transmission on f
2.
Then, terminate transmission.
f
2
Pass
2
Apply interference on f
2
at level T
U
+ U
M
, and
remove interference from f
1
immediately.
Also immediately initiate transmission but is at
least 20 ms after interference on f
2
is applied.
Verify transmission on f
1.
f
1
Pass

Table of Contents