Goodrive100-PV Series Solar Pumping VFD Keypad operation procedure
14
4 Keypad operation procedure
4.1 Keypad introduction
Keypads are used to control GD100-PV series VFDs, read the state data and adjust
parameters. If it is necessary to connect the keypad to other external device, you can use the
standard RJ45 cable with crystal head as the external extension cable.
Figure 4-1 Keypad diagram for VFDs 2.2kW
1
2
4
3
PRG
ESC
DATA
QUICK
JOG
SHIFT
RUN
STOP
RST
RUN/TUNE FWD/REV LOCAL/REMOT TRIP
HZ
A
V
RPM
%
Figure 4-2 Keypad diagram for VFDs 4kW
Note: External keypads can be configured for VFDs 2.2kW. The keypads of VFDs 4kW
can be used as external keypads.

Other manuals for INVT GD100-2R2G-SS2-PV

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the INVT GD100-2R2G-SS2-PV and is the answer not in the manual?

INVT GD100-2R2G-SS2-PV Specifications

General IconGeneral
BrandINVT
ModelGD100-2R2G-SS2-PV
CategoryInverter
LanguageEnglish

Related product manuals