Goodrive300-16 special inverter for HVAC Commissioning guidelines
22
3.4.2 Commissioning steps of basic functions
1. Check the circuits and ensure proper wiring;
2. P00.18=1, restore to factory default;
3. Input the parameters of motor name plate to P2 group and do motor autotuning;
4. P22.00=1, enable HVAC function;
5. P22.10=1, enable circulation variable frequency motor;
6. According to the actual situations, set multiple function codes of P22.11~P22.18 to 1 and
enable multiple circulation variable frequency motors; set the function codes to 2 and enable
power frequency motors;
7. According to the motor number, such as A and B, set P06 group;
8. Proper running and commissioning
3.4.3 List of control parameters
List of relevant function parameters (take 3 circulation variable frequency motors+2 power
frequency motors for example)