EasyManua.ls Logo

IPS Controllers M920 - Installation; Setup; Tools; Procedure

IPS Controllers M920
40 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
M920 & M920W pH/Dual ORP Controller Owners Manual
II. Installaon
A. Setup(Installaonvideoavailableatipscontrollers.com)
1. Turn o all peripheral equipment such as heaters, chemical feeders,
and pumps.
2. Relieve pressure from the ltraon system.
B. Tools
1. Cordless drill
2. 1/4” NPT Tap
3. 7/16” drill bit
4. 1/4” or 3/8” drill bit for Temp Sensor (oponal)
5. Masonry drill bit and anchors, or other appropriate fasteners
6. 13/16” wrench or channel-lock pliers
C. Procedure
1. Locaon
a. Wall area with easy access
b. Within 8 feet of feeder
c. At least 10 feet from water edge
d. Close proximity to me clock
e. Within 6 feet of GFCI power source
2. Mounng
a. Controller and ow cell are factory-mounted to ABS board for
your convenience.
b. Securely mount ABS mounng board with M920 controller and
ow cell on wall (vercal installaon).
c. If applicable, securely aach the peristalc pumps to the
oponal larger ABS mounng board with the provided
hardware.
11

Related product manuals