Flush Wall Fire Brick Finish Detail
Recommended Fire Brick Detail: With drywall crossing over the face of the IBV smoke dome assembly (as previously described
on page 22), to cover the exposed drywall thickness as well as to aid in the overall t and nish of the IBV front, it is recommended,
when installing the required re brick lining to the interior of the rebox, that the leading edge of the re brick - at the oor and
at the side walls of the rebox - project into the room so that the re brick is nished ush with the room’s nished drywall
surface.
This method of re brick application, as shown above (Figure 28), allows the re brick lining to cover the thickness of the drywall
room nish. Also, with re brick set in this fashion the code required noncombustible nish facing material (see page 28) can be
set tight against the re brick at the sides of the replace opening and at the same time lay at against the nished wall surface.
Noncombustible
Facing Material
Figure 28