Inspection and Installation 
  Copyright ©ITECH Electronic Co., Ltd.  1 
Chapter1 Inspection and Installation 
1.1 Verifying the Shipment 
Unpack the box and check the contents before operating the instrument. If 
wrong items have been delivered, if items are missing, or if there is a defect 
with the appearance of the items, contact the dealer from which you purchased 
the instrument immediately. The package contents include: 
Checklist of Package Contents 
Item  Qty.  Model  Remarks 
IT6900 power 
supply 
x1  IT6900 series 
The IT6900 series include: 
IT6922A/IT6932A/IT6933A/ 
IT6942A/IT6952A/IT6953A/ 
IT6922B/IT6932B/IT6933B/ 
IT6942B/IT6952B/IT6953B 
Power cord 
x1 
IT-E171/IT-E172
/IT-E173/IT-E17
4 
User may select an appropriate 
power cord that matches the 
specifications of power socket 
used in the area. See the Section 
Connecting the Power Cord for 
details. 
USB cable 
x1 
-  - 
Ex-factory Test 
Report 
x1  - 
It is the test report of the 
instrument before delivery. 
 
NOTE 
After confirming that package contents are consistent and correct, please appropriately 
keep package box and related contents. The package requirements should be met when 
the instrument is returned to factory for repair. 
IT6900 series power supply is supplied with the following optional accessories 
(sold separately): 
IT-E151A (Rack 
mount kit) 
To mount the instrument on a special rack, 
user may select this optional. 
 
1.2 Instrument Size Introduction 
The instrument should be installed at well-ventilated and rational-sized space.