EasyManua.ls Logo

Jacuzzi Platinum 2001 - Optional Ozone Generator Installation Instructions

Jacuzzi Platinum 2001
52 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation
Optional Ozone Generator Installation Instructions
Your “ozone ready” hot tub is designed for easy field conversion to an ozone generator system.
You will need:
A. Complete Ozone Kit
and
B. Mazzei Injector
Instructions:
1. Turn OFF electrical power and drain the hot tub.
2. Temporarily remove the equipment access skirt panel and other skirt panels as required for
access to the plumbing.
3. Cut off and discard the PVC caps at the end of each length of flexible vinyl tubing as shown
in Figure 1.
4. Insert Injector fitting into flexible vinyl tubing and secure with hose clamps (2). Do NOT
change the length of the flexible vinyl tubing downstream of the red ozone injector. Observe
the “proper orientation” of the ozone injector; make sure the molded-in arrow points downstream
to the footwell fitting. See Figure 2.
Page 11
(Some items not shown for clarity)
FIGURE 1 - "OZONE-READY" SPA BEFORE CONVERSION (SKIRTS REMOVED)
3/4" VINYL TUBING
WITH CAPPED END
(CUT OFF CAP)
FROM DISCHARGE
MANIFOLD OR
PUMP DISCHARGE
TO FOOTWELL FITTING
FIGURE 2 - OZONE INJECTOR LINE CONVERSION
FROM
DISCHARGE
(NOTE: Flow arrow on injector points downstream to footwell.)
TO
FOOTWELL
FITTING
IN-LINE DETAILS
HOSE CLAMPS
6540-202
MAZZEI

Related product manuals