EasyManua.ls Logo

Jain Technology XONIC 100L - Installation Position; Sensor Distance; Pipe Surface Preparation

Jain Technology XONIC 100L
42 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Xonic 100L, 2021
14
Finding Installation
Position
Please find enough straight run pipe position. Normally, clamp-on
ultrasonic flowmeter need 10 Upstream and 5 Downstream diameters
straight pipe run. Ensure adequate straight pipe to ensure smooth laminar
flow. Accuracy will be affected if not enough straight pipe can be found.
Sensor Distance
Using the Sensor distance, measure the installation area on the pipe using
ruler. Remember that the area must be large enough for Mounting Track
installation with the sensor placement approximately in the center of the
track.
Remove Pipe Coating
and make install position
flat and clean
Please remove all pipe coatings and Use an abrasive to thoroughly clean
the area. This is essential for good Ultrasonic coupling.
INSTALL
1 . SENSOR TYPE
2 . SAMPLING CLK
3 . MOUNT TYPE
4 . SENSOR DISTANCE
5 . INSTALL INFO.
6 . AUTO INSTALL
7 .
ACTUAL ZERO 238.693
SENSOR DISTANCE
UNIT : mm
서를 치를 하고
서의 물질
도록 타도
용하 정리다.
Pipe
Remove any coatings, and make this area
clean and flat for transducer mounting.