EasyManua.ls Logo

jcb JS130 - Page 312

jcb JS130
533 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
34 - 22
Pilot Valve
Dismantling
1 Remove housing 1.
2 Remove ‘O’-ring 2 and back-up ring 3 and discard.
Cleaning, Inspection
1 Clean all parts in clean oil and dry with compressed air.
Inspect all parts.
2 Ensure pilot holes are clean and free from sediment and
foreign matter.
3 Remove slight defects by lapping.
4 Renew damaged or badly worn parts.
Assembly
Assembly is the reverse of the dismantling procedure.
Torque Settings
1 97.63 Nm (72 lbf ft)
Section E Hydraulics
9803/6410
Section E
34 - 22
Issue 1
Control Valve
JS01410

Table of Contents

Related product manuals