EasyManua.ls Logo

jcb JS130 - Page 313

jcb JS130
533 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
34 - 23
Check Valve (4 Spool Section)
Dismantling
1 Remove housing 1.
2 Remove ‘O’-ring 2 and discard.
3 Withdraw check valve 3 and spring 4.
Cleaning, Inspection
1 Clean all parts in clean oil and dry with compressed air.
Inspect all parts.
2 Ensure check valve 3 moves smoothly.
3 Check that spring 4 has no defects, deformation or
wear.
4 Remove slight damage by lapping.
5 Renew damaged or badly worn parts.
Assembly
Assembly is the reverse of the dismantling procedure.
Torque Settings
1 39.32 Nm (29 lbf ft)
Section E Hydraulics
9803/6410
Section E
34 - 23
Issue 1
Control Valve
JS01420

Table of Contents

Related product manuals