EasyManua.ls Logo

jcb JS130 - Page 314

jcb JS130
533 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
34 - 24
Bucket Flow Check Valve
Dismantling
1 Remove cover plug 1.
2 Remove ‘O’-ring 2 and discard.
3 Withdraw spring 3 and check valve 4.
Cleaning, Inspection
1 Clean all parts in clean oil and dry with compressed air.
Inspect all parts.
2 Ensure check valve 4 moves smoothly.
3 Check that spring 3 has no defects, deformation or
wear.
4 Remove slight defects by lapping.
5 Ensure pilot holes in check valve 4 are clean and free
from sediment and foreign matter.
6 Renew damaged or badly worn parts.
Assembly
Assembly is the reverse of the dismantling procedure.
Torque Settings
1 97.63 Nm (72 lbf ft)
Section E Hydraulics
9803/6410
Section E
34 - 24
Issue 1
Control Valve
JS01430
JS01440

Table of Contents

Related product manuals