6- INSTALLATION AND INITIAL START-UP
26
QUANTUM TOUCH
When installing the machine, unobstructed dimensions are required as follow image:
1. Place the dispenser on a at horizontal surface.
2. Connect the water inlet hose (A to A).
3. Then open the water tap (B) and check for leaks.
4. Insert the power plug in the earth wall socket (C to C) and then the dispenser will start automatically.
5. Dispenser will ll and heat up the boiler automatically.
6. Drinks will be delivered when the water in the boiler has reached the appropriate temperature.
NOTE:
Connect the machine to an easily accessible supply point so that the water supply can
be cut o quickly in an emergency.
NOTE:
It may take 20 hours to cool down the cooling compartment completely.
NOTE:
The electrical connection to the machine (wall socket), must contain earth leakage
circuit breaker protection (ELCB)!
i
i
i
6.3 Dispenser start-up
C
C
B
A
A