EasyManua.ls Logo

JLG 642 - Shut-Down Procedure

JLG 642
202 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Section 4—Operation
4-531211031
Shut-Down Procedure
When parking the telehandler, park in a safe location on flat level ground and away from
other equipment and/or traffic lanes.
1. Apply park brake.
2. Shift transmission to “Neutral”.
3. Lower forks or attachment to ground.
4. Operate engine at low idle for 3 to 5 minutes. DO NOT over rev engine.
5. Shut off engine and remove ignition key.
6. Exit telehandler properly.
7. Purge indicator (4) will illuminate until DEF is purged from the system. Do not turn
key (5) to off while indicator is illuminated.
8. Turn off electrical master switch.
9. Block wheels (if necessary).
OD1730
4
5

Table of Contents