Section 4—Operation
4-1331211031
Placing a Suspended Load
Before placing any load be sure that:
Landing point can safely support weight of load.
Landing point is level; front to back and side to side.
Use capacity chart to determine safe boom extension range. See “Use of the Capacity
Chart” on page 5-5.
Align load at level the load is to be placed, then position boom slowly until load is just
above area where it is to be placed.
Ensure that guide persons and operator remain in constant communication (verbal or
hand) when placing load.
Disengaging a Suspended Load
Never place guide persons between suspended load and telehandler.
Once at destination of load, ensure to bring telehandler to a complete stop and apply
park brake prior to disengagement of lifting devices and tethers.