Parameter Description Value
ECOTPIMP_MIN Minimum supply temperature for economiser 11,5 °C
ERTPCON Opening percentage to start up the air exhaust 30%
GASTION_OFF Gas stage delay 0 min.
GOODINPUTCNT Number of identical readings to achieve the correct entry of DS2406 5
MAQTICMP_CMP Delay between start-ups of compressors 5 sec.
MAQTIMAN Manual operation time, economiser and water valve 30 sec.
MAQTION_OFF Time between start ups and stops 1 sec.
MAQTIVXT_CMP Start-up time of the outdoor fan and the compressor 4 sec.
MAX_LOG_AVERIAS Number of faults saved 9
NTCTPABIERTA Probe time to be considered for short circuit -33.5 °C
NTCTPCORTO Temperature to be considered for open or non-existent probe 93.5 °C
PHITIINH Time lapse for high-pressure switch 30 sec.
PLOTIINH Time lapse for low-pressure switch 2 min.
POTPCSENSE Minimum movement of the potentiometer for a change to be considered 4 LSB
RESNOTERMIC Number of times that the thermal switch can trip in one hour 3
RESTIEVAC_CAL Residual heat and cold evacuation time 60 sec.
RESTION_OFF Electrical resistor delay 0 min.
T_INIGAS Times that the gas burner automatically resets 5
T_REC_TEMP Time for the supply temperature to rise above 25 °C in gas stages 10 min.
TASP_ECOOFF Suction temperature below that at which the economiser is closed 0 °C
TASP_ECOON Suction temperature in order for the economiser to reopen 4 °C
TEMP_IMP_AVR Supply temperature in order for the unit to stop and indicate a fault 80 °C
TEMP_MAX_IMP Supply temperature in order for stages to begin to be stopped 55 °C
TEMP_MIN_IMP Minimum gas supply temperature 25 °C
TEXTHABILCOMP1
If the supply temperature is < 14 °C and the outdoor temperature > 10 °C
compressors disabled
10 °C
TEXTHABILCOMP2
If the supply temperature is < 14 °C and the outdoor temperature > 12 °C
let compressors operate
12 °C
TIDES The time between defrosts in accordance with SW1 and SW2. 0', 30' ,60' ,90'
TIMPHABILCOMP
If the supply temperature is < 14 °C and the outdoor temperature < 10 °C
only the economiser operates
14 °C
TMP_ACT_ECO Time until economiser operates 1 sec.
TMP_PAS_A_OFF
Minutes to switch to OFF after the stages stop, during which the air quality
demand can actuate
20 min.
TRMTIDEMANDA Sampling time of the demand calculation 10 min.
TRMTPHIST Hysteresis of the Set-Point 0,25 °C
V4VTICMP Change delay time of the 4-way valve after the compressor is stopped 60 sec.
VXTTPBATX_OFF Stopping of the 2nd fan with a crossed coil. Fan no. 1 compressor side 16 °C
VXTTPBATX_ON Start-up of the 2nd fan with a crossed coil. Fan no. 1 compressor side 19 °C
When the service button is briefly pressed, the parameters indicated below are momentarily changed to
the value in the test column.
Parameter
Description Value Battery
CMPTION Compressor delay 4 min 10 sec.
DFRTICONF Defrost confirmation time 3 min. 10 sec.
DFRTIMAX Defrost maximum time 10 min. 30 sec.
DFRTISECADO Coil drying time 1 min. 1 sec.
MAQTIMAN Manual operating time 30 s. 2 sec.