1.3.3 Hoisting points
The points designed for hoisting the unit are located
on the beams on its base.
Before hoisting the unit, check that the cables or
slings are firmly hooked to these points using
shackles -2- and make sure the crane and the cables
or slings are capable of lifting the weight.
Place spacers -1- at the top of the unit to prevent the
cables or slings from touching it.
Attach guide ropes so that the unit does not rotate
freely.
The cables or slings should be long enough to form
an angle of over 45° to the horizontal plane. Hoist the
unit keeping it in a horizontal position.
D A N G E R
There should not be onlookers within a radius of 10
m of the unit when it is being hoisted.
1.3.4 Disposal of the unit
When removing the unit, the components must be ecologically recovered. The cooling circuit is full of
coolant that must be extracted and delivered to the gas manufacturer for recycling.
A T T E N T I O N
The refrigerant gas contains greenhouse-effect fluorinated gas covered by the Kyoto protocol.
Please see the specifications plate for type of gas and quantity per system.
GWP (Global Warming Potential): 2088
There will be oil left in the hermetic compressor, therefore it must be delivered with the circuit sealed.
The air conditioner shall be deposited in the area established by local authorities, to facilitate its selective
recovery.
1.3.5 Handling
The unit must be moved using the metal rails provided for its installation and transport
1.4
Selection guide (YLCA/YLHA)
Necessary information
The following information is needed to select a YLCA/YLHA water cooling unit:
1. Cooling capacity needed
2. Design cold water inlet and outlet temperatures.
3. Design water flow rate, if one of the temperatures of Point 2 above is unknown.
1
Quick installation guide
1.4 Selection guide (YLCA/YLHA)
4