EasyManua.ls Logo

Julabo F500 - Page 17

Julabo F500
35 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
F250, F500, F1000
F250
Before operating the unit after transport, wait about
one hour after installation.
This will allow any oil that has accumulated laterally
during transport to flow back down, thus ensuring
that the compressor can develop its maximum
capacity.
Remove cap screws from the connections.
Connect the tubing from the external system to the
pump connectors and check for leaks.
F500, F1000
If required, connect a hose to the overflow and
drain into a suitable container, which must be
positioned deeper than the initial "overflow".
Do not seal the overflow!
1.951.4806-V2 17

Other manuals for Julabo F500

Related product manuals