EasyManua.ls Logo

Julabo F500 - Page 29

Julabo F500
35 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
F250, F500, F1000
Switch off the unit
Wait for approx.2 seconds
Switch on the unit
If the error occurs again, a remote diagnosis must be made.
If the unit cannot be returned to operation, contact an authorized
JULABO service station.
(1)
Disturbances that are not indicated.
Overload protection: a) for cooling machine
b) for pump motor
After a short cooling interval, the unit will automatically start
running.
Main fuse:
The main switch (1) of the device is also a circuit breaker.
After a cooling period, the unit can be switched on again.
1.951.4806-V2 29

Other manuals for Julabo F500

Related product manuals