EasyManua.ls Logo

Kannad AF INTEGRA - SERVICING; Maintenance Schedule and Periodic Inspection

Kannad AF INTEGRA
52 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
OPERATION MANUAL
AF INTEGRA / AF-H INTEGRA ELT
PAGE: 601
JUN 20/2013
SERVICING
1. Maintenance Schedule
A. Periodic inspection
Note: (if required by the relevant Civil Aviation Authority).
Some Civil Aviation Authorities may require the ELT be tested periodically.
In this case, refer to Service Letter SL S1840501-25-05 "Guidelines for periodic
inspection" available on the Service & Support section of Kannad Aviation
Website.
B. Battery replacement
Testing of various elements and parameters of the ELT is mandatory when the
battery is replaced.
For battery replacement interval, Refer to § 2. Battery replacement
requirements, page 602.
The testing procedure associated with the battery replacement is
described in the relevant CMM
For CMM download and other servicing instructions, refer to Servcie & Support
section of Kannad Aviation Website.
Battery replacement:
carried out by an accredited PART 145 or FAR 145 (or equivalent)
maintenance station.
Periodic inspection:
depending if the ELT is opened or not, PART 145 or FAR 145 (or
equivalent) may be required. Refer to local regulations

Other manuals for Kannad AF INTEGRA

Related product manuals