EasyManua.ls Logo

Kemppi ArcValidator - Power Source Verification

Kemppi ArcValidator
36 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ArcValidator
Operating manual - EN
3.1.1 Power source verification
The images used in this instruction are examples of an automatic verification flow and for illustrative purposes only.
For adding and editing equipment profiles, refer to "Managing equipment types and models" on page28.
1. Connect and turn the equipment on (as described in "Connections" on page10).
>> Turn the welding equipment on first and then the ArcValidator load bank. Wait until both are fully started.
>> Ensure that the welding equipment settings are suitable for the verification process in question.
2. On the ArcValidator RC screen, select the equipment type (power source), verification process (manual or auto-
matic) and the verification grade (standard or precision).
3. Define the equipment make and model.
4. Select the welding process to be verified (if applicable).
© Kemppi
21
AVPCRC / 2224

Related product manuals