EasyManua.ls Logo

Keysight Technologies N5222B

Keysight Technologies N5222B
88 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
86 Installation Note N5222-90131
Description of the Upgrade
Installation Procedure for the Upgrade
-
Step 54. Prepare the PNA for the User
1. If necessary, reinstall front jumper cables.
2. Install the cable guards, pushing them over the front jumper cables until
the cushioning material touches the front panel of the PNA.
3. Install the dust caps on the test ports.
4. Clean the analyzer, as needed, using a damp cloth.

Table of Contents

Related product manuals