Keysight i3070 Series 6
In-Circuit Test System
Site Preparation
Question and Answer IconNeed help?

Do you have a question about the Keysight i3070 and is the answer not in the manual?

Keysight i3070 Specifications

General IconGeneral
Operating SystemWindows
Relative Humidity20% to 80% non-condensing
ConnectivityLAN
DimensionsVaries depending on configuration
WeightVaries by configuration

Summary

Site Preparation Process

The Importance of Site Preparation

Explains why site preparation is crucial for system installation and operation.

Site Prep Checklist

Provides a checklist for tasks to be completed during the site preparation phase.

Planning

The System Plan Drawing

Guides the creation of a system plan drawing for site preparation and installation.

Structural Requirements

Floor Requirements

Specifies the necessary floor load capacity and characteristics for system installation.

Moving Access Requirements

Details the dimensions and clearance needed for moving the system into the installation area.

RF Attenuation Requirements

Calculating Site Attenuation

Provides methods to calculate required and available site attenuation for RF compliance.

Environmental Requirements

Air Temperature Requirements

Specifies the acceptable ambient temperature ranges for system operation and storage.

Power Requirements