Current Calibration
Voltage calibration must be completed prior to calibrating current.
High Range Programming and Measurement
Step 1. Connect an external power supply to the module's input terminals configured to source 3 V
with a current limit of 21 A (42 A for N6792A). Connect a precision current shunt resistor in series with
the unit's input and a precision voltmeter to measure the voltage across the shunt. The shunt resistor
should be suitable for measuring current corresponding to 120% of the rated current of the load
module's high current programming range. (see Cal Setup H). Turn on the output of the power supply.
Step 2. Select the full-scale current programming range. The value to program a range must be the
maximum current of the range. The following example selects the 20 A full-scale range of output 1.
Full-scale ranges vary according to model.
Front Panel Menu Reference SCPI Command
Select System\Admin\Cal\Curr\Iprog
Select the High range. Then press Next.
CAL:CURR 20, (@1)
Step 3. Select the first current calibration point. Wait a minimum of 10 seconds for the temperature to
stabilize before measuring the input current and entering the data.
Front Panel Menu Reference SCPI Command
Display shows: “Enter P1 measured data” Calculate the shunt current (I=V/R)
and enter the data.
Press Select when done.
CAL:LEV P1
*OPC?
CAL:DATA <data>
Step 4. Select the second current calibration point. Wait a minimum of 5 minutes for the temperature
to stabilize before measuring the input current and entering the data.
Front Panel Menu Reference SCPI Command
Display shows: “Enter P2 measured data”
Calculate the shunt current (I=V/R) and enter the data.Press Selectwhen done.
CAL:LEV P2
*OPC?
CAL:DATA <data>
Step 5. Select the third current calibration point. Wait a minimum of 5 minutes for the temperature to
stabilize before measuring the input current and entering the data.
Front Panel Menu Reference SCPI Command
Display shows: “Enter P3 measured data”Calculate the shunt current (I=V/R)
and enter the data.
Press Select when done.Press Next to finish calibration.
CAL:LEV P3
*OPC?
CAL:DATA <data>