EasyManua.ls Logo

Keysight N6751A - Overview

Keysight N6751A
40 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1-2 N67xx DUT Power Supply Installation
Overview
The DUT power supplies are installed in the rack(s) behind the i3070 Series 6
testhead.
Figure 1-1 shows the location of DUT power supplies in a 4-module system (rear
view, service position). A 2-module system contains only Bank 2 and one rack for
the DUT power supplies. The same installation instructions apply.
Figure 1-1 DUT power supplies in 4-module system
Install the DUT power supplies in the outer slot first, followed by the middle slot and
lastly the inner slot.
Figure 1-2 Assembly sequence of DUT power supplies
DUT power supplies
testhead
Bank 1 Bank 2
Above Bank 2
Module 3 Channel 1–4
Mod ule 1 Channel 1–4
Mod ule 3 Channel 1–4
Mod ule 2 Channel 1–4
Mod 2
Channel 5–6
Mod 3
Mod ule 0 Channel 1–4
Mod 2
Channel 5–6
Mod 3
Above Bank 1

Other manuals for Keysight N6751A

Related product manuals