EasyManua.ls Logo

KI Seminar - Page 12

Default Icon
28 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
12
Assemble units as described herein only. To do otherwise
may result in instability. All screws, nuts and bolts must be
tightened securely and must be checked periodically after
assembly. Failure to assemble properly, or to secure parts
may result in assembly failure and personal injury.
Seminar
TM
Tables with 4-Wire Power System - Two-Direction Receptacle Hub Shrouds
Assembly Instructions
Figure - Power Infeed -Direction Shroud ()11 Two center
receptacle
hub shroud
jumper
knock out
receptacle
jumper
#x /”10
3
4
screw
tabletop
Detail F
duplex
receptacle
receptacle
orientation
marking
receptacle
hub shroud
4-wire
blockquad
two-direction
power infeed
plug end
two-direction
power
infeed shroud
#x /”10
3
4
screw
Two-Direction Power Infeed
Installation (cont.)
23. Orient each receptacle hub shroud
so the “receptacle orientation
marking” at the underside of the
shroud matches the orientation
of the correctly installed duplex
receptacles under the tabletop.
Remove jumper knock-outs from
ends where power cables will
run through, then position each
receptacle hub shroud up correctly
over the receptacle and secure
using four #10 x
3
/
4
” screws as
illustrated (Figure 11 & Detail F).
24. At the power infeed location,
a two-direction power infeed
shroud must be installed. Before
installation, remove the knock outs
at at each end of the two-direction
infeed shroud. Position the infeed
shroud as illustrated over the power
infeed with quad block and jumpers
against the table mounting flange
then secure to the underside of the
table using three #10 x
3
/
4
” screws
(Figure 11).

Related product manuals