Operating manual Energy storage solutions
V1.3DE/EN
34
7 Extension module
English
Fig. 18: Discharging the Energy storage solution (top side of the housing)
On the extension module, disconnect the connecting cable from X2, connect it to
X1 of the Energy storage solution and wait for approx. 30 seconds.
The Energy storage solution will be discharged.
Fig. 19: Connect the Energy storage solution
and the extension module (top side of the housing)
On the extension module, detach the connecting cable from X3 and insert it into
X1 on the extension module.
The Energy storage solution and the extension module are connected.