EasyManua.ls Logo

Kohler COURAGE SV710-740 - Page 92

Kohler COURAGE SV710-740
150 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...

6HFWLRQ
(OHFWULFDO6\VWHPDQG&RPSRQHQWV
)LJXUH7HVWLQJ3XOO,Q&RLO6ROHQRLG&RQWDFW
&RQWLQXLW\
7HVW6ROHQRLG+ROG,Q&RLO)XQFWLRQ7HVW
Connect one 12 volt test lead to the at spade S/start
terminal on the solenoid, and the other lead to the
body or mounting surface of the solenoid. Then,
manually push the plunger in and check if the Hold-
In coil holds the plunger retracted. See Figure 7-70.
Do not allow the test leads to remain connected to the
solenoid for a prolonged period of time. If the plunger
fails to stay retracted, the solenoid should be replaced.
YROW7HVW/HDGV
0RPHQWDU\
&RQQHFWLRQ2QO\
920/HDGV
)LJXUH7HVWLQJ+ROG,Q&RLO)XQFWLRQ7HVW
)LJXUH7HVWLQJ+ROG,Q&RLO6ROHQRLG&RQWDFW
&RQWLQXLW\
0DQXDOO\3XVK
3OXQJHU³,Q´
YROW7HVW/HDGV
&RQQHFW2QO\/RQJ
(QRXJKWR7HVW
3OXQJHU
3XVKHG³,Q´
9200HWHU
/HDGV
YROW7HVW/HDGV
7HVW6ROHQRLG+ROG,Q&RLO&RQWDFW&RQWLQXLW\7HVW
Use an ohmmeter set to the audible or Rx2K scale, and
connect the two ohmmeter leads to the two large post
terminals. Perform the preceding test (3) and check for
continuity. See Figure 7-71. The meter should indicate
continuity, if no continuity is indicated the solenoid
should be replaced. Repeat test several times to conrm
condition.
7HVW6ROHQRLG3XOO,Q&RLO&RQWDFW&RQWLQXLW\7HVW
Use an ohmmeter set to the audible or Rx2K scale, and
connect the two ohmmeter leads to the two large post
terminals. Perform the preceding test (1) and check
for continuity. See Figure 7-69. The ohmmeter should
indicate continuity, if no continuity is indicated the
solenoid should be replaced. Repeat test several times to
conrm condition.

Other manuals for Kohler COURAGE SV710-740

Related product manuals