TP-6928 1/14 11Section 1 System Information and Installation
RDC2 or DC2
Generator Set Controller
Router *
Cable or
DSL
Modem *
* Customer-provided
[ The load shed kit, if equipped, is installed inside the ATS enclosure.
Tablet *
Ethernet cables *
UPS *
(optional)
PC/
laptop *
Kohlerr System
Multiple PCs can
be connected.
ATS
LCM or
Load
Shed
Kit [
PIM
G6-116
Smart phone*
OnCue Plus
Server on the
Internet
Figure 1-2 Typical Connections for RDC2/DC2 Controller
Tablet *
Smart phone*
VSC Generator Set
Controller
Router *
Cable or
DSL
Modem *
* Customer-provided
[ One optional PIM or one communications kit c an be installed
Ethernet cables *
UPS *
(optional)
Kohlerr System
Multiple PCs can
be connected.
PIM or
comm. kit [
G6-116
Battery Bank *
PC/
laptop *
OnCue Plus
Server on the
Internet
Figure 1-3 Typical Connections for VSC Controller