EasyManua.ls Logo

KPI-JCI FT300DF - Mantle Liner Change Procedure; Backing Material Procedure

KPI-JCI FT300DF
480 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
MAINTENANCE
CRUSHER MAINTENANCE
283
2. Relieve all hydraulic pressure.
3. Lockout/tagout the crusher and any related components. Follow all local lockout/tagout procedures and
regulations.
4. Remove the bowl rotation hoses, bowl clamp hose, and position indicator cable.
NOTE: Pressure will be trapped behind the ball checks if the pressure was not relieved prior to being discon-
nected. This will make reconnecting nearly impossible.
1 Drive Ring
2 Crushing Zone Indicator
1 Position Indicator Cable
2 Bowl Rotation Hoses (not shown)
3 Bowl Rotation Hoses

Table of Contents

Related product manuals