LOADING AND SECURING
104
Operating instructions • Load Carrier • 505410638-02 • 07/2019
Place the sliding shoes on the footing
beam in the required position and al-
low them to engage.
1 2
3
Fig.8-22: Sliding shoe secured with plug-in
bolt and spring cotter pin
1 Spring cotter pin
2 Plug-in bolt
3 Sliding shoe
Insert the plug-in bolt into the hole.
Secure the plug-in bolt with a spring
cotter pin.
Insert the support beam vertically into
the sliding shoes.
ü The Multi Fix system has been inser-
ted.
Securing steel pipes with the Multi Fix
system
Position the steel pipes on the footing
beam between the vertical support
beams (see "Fig. 8-18: Multi Fix system",
pg.103).
Install the safety net at the ends of the
steel pipe (see "Fig. 8-18: Multi Fix sys-
tem", pg.103).
Pull the tension straps through the
eyelets of the safety nets.
Hook the tension straps onto the Multi-
lock external frame.
Lash the tension straps.
ü The steel pipes are secured.