KSB Etanorm V Specifications

General IconGeneral
Operating PressureUp to 16 bar
ApplicationWater supply, irrigation
Casing MaterialCast iron, stainless steel, bronze
Size RangeDN 32 to DN 300
MaterialsCast iron, stainless steel, bronze
Seal OptionsMechanical seal, gland packing

Summary

Safety

Key to safety symbols/markings

Defines hazard symbols and signal words used in the manual.

Intended use

Specifies the correct and prohibited uses of the pump set.

Personnel qualification and training

Outlines requirements for personnel operating the equipment.

Consequences and risks caused by non-compliance with this manual

Details risks arising from not following manual instructions.

Safety information for the operator/user

Provides specific safety advice for operators.

Safety information for maintenance, inspection and installation

Offers safety guidance for maintenance tasks.

Unauthorised modes of operation

Warns against operating the pump outside specified limits.

Installation at Site

Checks to be carried out prior to installation

Pre-installation checks for structural integrity.

Installing the pump set

Step-by-step guide for mounting the pump set.

Piping

Instructions for connecting the piping to the pump.

Connecting the piping

Detailed steps for connecting the pump's piping.

Permissible forces and moments at the pump nozzles

Specifies allowable forces and moments on pump nozzles.

Electrical connection

Guidelines for connecting the pump's electrical system.

Connecting the motor

Steps for connecting the motor to the power supply.

Checking the direction of rotation

Procedure for verifying the correct motor and pump rotation.

Commissioning/Start-up/Shutdown

Commissioning/Start-up

Steps for bringing the pump into operation.

Prerequisites for commissioning/start-up

Conditions to meet before starting the pump.

Priming and venting the pump

Procedures for filling and removing air from the pump.

Start-up

Detailed steps for safely starting the pump.

Shutdown

Procedures for safely stopping the pump.

Operating limits

Defines the operational boundaries for the pump.

Servicing/Maintenance

Safety regulations

Essential safety rules for performing maintenance.

General information/Safety regulations

Safety rules for reassembly.

Trouble-shooting

Pump delivers insufficient flow rate

Addresses issues with low flow rate from the pump.

Motor is overloaded

Troubleshooting steps for an overloaded motor.

Increased bearing temperature

Diagnosing and resolving high bearing temperatures.

Vibrations during pump operation

Identifying causes and solutions for pump vibrations.