8 MOWER MOUNTING
(1) Front link
(2)
Front roller bracket
NOTE:
• Adjust the length (L)
of
the front link.
(See "ADJUSTING
THE PARALLEL LINKAGE"
in
"MOWER MOUNTING" section.)
8.
Pull the lever fulcrum fixing pin and turn it counter
clockwise to
lock.
9.
Hook and raise the front link with the link fixing lever,
and then lay the link fixing lever onto the front bracket
of
the machine.
10.
Turn the lever fulcrum fixing
pin
clockwise and push it
into position to fix the
link fixing lever.
(1)
Link fixing lever
(2)
Lever fulcrum fixing pin
(3)
Front link
(4)
Front bracket
11.
Pull back the coupler
of
the universal joint.
Push the universal joint into the PTO shaft until the
coupler locks.
Tug the universal joint backward and forward to make
sure it is
locked securely.
IMPORTANT:
• Finally pull the universal jOint to check if it
is
tight
in
position.
1
BDAHADAP001A
(1) Universal
joint
(2) Coupler
NOTE:
(A) "TUG"
• For dismounting the mower deck, reverse the above
procedures.