Maintenance
First 8 Hours
Maintenance XR700 062419 5-5
5
Lubricate all joints and moving parts which are not equipped with grease fittings.
(Recommend the use a nickel-based anti-seize for these areas).
Inspect entire Articulator for loose or entangled parts, debris, obstructions, mis-
placed tools, or any other possible safety hazards, equipment hazards or projectile
hazards. Clean off decks of any dirt, grease or oil.
Clean and gauge wheels to reset the bearing pre-loads such that spindles are loose
enough to spin freely only one complete revolution when spun by hand; ensure
spacers are properly installed.
Perform the appropriate maintenance procedures listed in your tractor manual.
Verify proper installation, operation and flow of grass chutes.
5.5 First 8 Hours
Check deck alignment and belt tension.
Lubricate the PTO quick-disconnect pin or twist sleeve. (Recommend the use a
nickel-based anti-seize for these areas).
5.6 First 50 Hours
Change gearbox lube with 80W90 gear oil.
5.7 Every 50 Operating Hours
Check deck alignment and belt tension.
Check deck drive belt alignment.
Grease all blade spindle bearing housings. Fill until grease purges from the weep
hole in the side of the bearing housing.
Inspect all bushings for wear. Replace as needed.
Inspect gearbox pivot stop bolts, wear pad, and bushings. Replace or adjust as
needed.
Check and clean, if necessary, any debris that may have accumulated during
operation.
Check gearbox lube level and condition.