3
No: IS-00708 Rev. B
EQUINOX 73-LCAP
LCD SCREEN
ADJUSTABLE
SCREWS
BEZEL
(Optional)
SHEETROCK
(Shown semi-transparent)
MOUNTING
SCREWS
SCREWS
CAT5e/6
MOUNTING
BRACKET
BRACKET
INSTALLATION OVERVIEW
STEP 1. Mount left or right side of
framing studs. The recommended
mounting wall height is six inches
above that of a typical keypad station or
approximately 50” to 58” from the oor
to the bottom of the wall box. However,
it may be installed at any height tting
your installation requirements. It is
recommended to use the 16” adjustable
bracket, VHA-112, which adds
considerable stability to any installation
method.
STEP 4. Loosen screws and slide in or
out for proper depth. Slide the mounting
bracket in or out until it ts the supplied
depth guide shipped with the Equinox
73-LCAP screen – 1” (25mm) from bracket
to front of nished wall. Secure screws
again when the depth has been set. See
Mounting Ring Adjustment Tool card on
pg 5. It is not necessary to remove the
mounting bracket as illustrated - this has
been done to simplify the illustration.
STEP 5. Finish by pulling wire. Pull
the CAT5e/6 Ethernet wire connection
through the bezel – if using the optional
bezel – and connect to the Equinox 73-
LCAP touchscreen. It is now ready for the
Equinox 73-LCAP touchscreen installation.
STEP 6. Insert and connect the Equinox
73-LCAP or add optional bezel before
insertion. At this point, attach the optional
bezel then insert the Equinox 73-LCAP
touchscreen, carefully working straight
back into the mounting bracket until
secure.
STEP 2. Secure to framing with screws
and install CAT5e/6 PoE network
cable. Mount the wall box to wall studs as
illustrated. Mount the box so the mounting
brackets are ush with the edge of the
framing stud allowing sheetrock to wrap
around the box when wall is nished.
Insert the cardboard paint protector.
NOTE: Install Ethernet cable, CAT5e or
better with PoE or PoE+ support before
wallboard. Use one of the top or bottom
3/4” knock-outs. Secure CAT5e/6 cable
using a 2-screw connector or equivalent.
Terminate cable with an RJ45 connector.
STEP 3. Adjust the mounting bracket
for proper depth: set 1” (25mm)
from the wall face (See Step 4). The
sheetrock hole is cut to 4.38” high by
6.38” wide allowing the box to protrude
part way into the sheetrock hole. The
mounting bracket’s depth must be set
so when inserting the Equinox 73-LCAP
screen it will snap securely into the box –
set at 1” from bracket to front of nished