EasyManua.ls Logo

Leica FlexLine - Starting Peg Survey

Leica FlexLine
44 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Peg Survey FlexLine/FlexLine plus, 11
2.2 Starting Peg Survey
Access 1. Select Programs from the Main Menu.
2. Select PegSurvey from the Programs menu.
3. Complete the application pre-settings by:
Selecting a job, and
Confirming the set of tolerances. Refer to "1.2 Selecting Tolerance Profiles".
4. Select Start to proceed to Input Station.
Input station step-
by-step
Step Description
1. Enter the point ID of the station (Station:).
2. For manual entry of instrument height:
Enter instrument height (hi:) of the station.
For measuring the instrument height:
Turn the telescope to the azimuth with the help of the displayed
vertical angle (V:).
Press Meas hi to measure distance to the peg.
)
The sign for the instrument height is normally negative.
3. Press Cont to set the station and instrument height.

Other manuals for Leica FlexLine

Related product manuals