EasyManua.ls Logo

Lenovo Neptune DWC RM100 - Fig.17 - Fill Pressure & Level Flow Chart (at Initial Start)

Lenovo Neptune DWC RM100
51 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CDU Operating & Maintenance Guide Page 23
Neptune DWC RM100 in-rack Coolant Distribution Unit
Start enabled
(RM100 on-line)
Is water level
sensor made?
Fill pressure
(PS1) ≥ a+b ?
a = fill pump ‘switch on’ threshold
pressure (default 0.8 Bar (12psi))
b = fill pump ‘switch off’ hysteresis
pressure (default 0.2 Bar (3psi)
‘Fill Pump Request’
& manual
fill pump start
N
Y
RM100 starts
Fill pump inhibited
Fill pump stops
Y
Y
N
A15 Water
Make-Up Empty
Is water level
sensor made?
N
Y
Has fill pump
run > 1 min?
N
A30 Check
Water Make-Up
Has fill pump
run > 5 secs?
Y
N
RM100 initial
start-up
A35 Illegal Water
Sensor Condition
Pressure: No
Level: No
RM100 start-up
inhibited
A16 Insufficient
Water
Pressure: No
Level: Yes
Pressure: Yes
Level: No
Unit off-line, commissioned,
with make-up fill bag connected
Fig.17 Fill Pressure & Level Flow Chart (at initial start)

Table of Contents

Related product manuals