EasyManua.ls Logo

Lenovo ThinkSystem ST250 - Page 77

Lenovo ThinkSystem ST250
116 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Before installing the hot -swap power supply,
1. Watch the procedure. A video of this procedure is available from the following links:
Youtube:
https://www.youtube.com/playlist?list=PLYV5R7hVcs-Dy5N2dPXFx5Pht-FljAi6S
Youku: https://list.youku.com/albumlist/show/id_51977169
2. Touch the static-protective package that contains the component to any unpainted metal surface on the
server; then, remove it from the package and place it on a static-protective surface.
To install the hot-swap power supply, complete the following steps:
Step 1. If there is a power-supply-bay filler installed, remove it.
Important: To ensure proper cooling during normal server operation, both of the power supply
bays must be occupied. This means that each bay must have a power supply installed; or one has
a power supply installed and the other has a power-supply filler installed.
Figure 51. Hot-swap power supply filler removal
Step 2. Note the orientation of the hot-swap power supply, and then slide it into the chassis until it snaps
into position.
Chapter 3. Server hardware setup 73

Table of Contents

Related product manuals