Lenze · Controller-based Automation · PROFIBUS® Communication Manual · DMS 4.6 EN · 11/2016 · TD17 53
Index
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
A
Activating the bus terminating resistor
27
Adding devices
34
Adding field devices
34
Application notes
9
Application software of the Lenze Controllers
13
B
Baud rate
25
Brief description of PROFIBUS
15
Bus cable length
25
C
C1031 | Device: Identification
51
C1032 | Device: Version
51
C1033 | Device: Name
51
C1034 | Device: Software version
51
C1035 | Device: Hardware version
51
C1036 | Device: Serial number
51
C1037 | Device: Manufacturer
52
C1038 | Device: Manufacturing date
52
CAA_Device_Diagnosis.lib
44
CAA_Device_Diagnosis.lib function library
44
Cable specification of bus cable
25
Codes
51
Commission the field devices
28
Commissioning of PROFIBUS
26
Communication medium
23
Communication settings
31
Compiling the PLC program code
42
Configuration of the PROFIBUS master
38
Configuring the communication parameters
31
Configuring the PROFIBUS slave
41
Conventions used
7
Create a project folder
28
Creating a control configuration
34
Creating a PLC program with a target system (Logic/Motion)
29
Creating a target system (Logic/Motion)
29
D
Defining the minimum cycle time of the PLC project
45
Determining the task utilisation of the application
45
Device
Hardware version (C1035)
51
Identification (C1031)
51
Manufacturer (C1037)
52
Manufacturing date (C1038)
52
Name (C1033)
51
Serial number (C1036)
51
Software version (C1034)
51
Version (C1032)
51
Diagnostics
48
Diagnostics with the »PLC Designer«
50
DP Parameters
38
,
41
E
EASY Navigator
22
E-mail to Lenze
55
Engineering software
22
Engineering tools
22
F
Feedback to Lenze
55
Field devices
20
Fieldbus communication (interfaces)
14
Function libraries
44
I
I/O data of MC-PBM (master)
23
I/O data of MC-PBS (slave)
23
IIoDrvDPV1C1.lib
44
IIoDrvDPV1C1.lib function library
44
Importing device description files
33
Importing missing devices
33
Installing field devices
27
Interfaces for fieldbus communication
14
L
Layout of the safety instructions
9
LED status displays of the MC-PBM communication card
48
LED status displays of the MC-PBS communication card
49
Lenze Engineering tools
22
Logging in on the controller
42
Logging in on the controller with the »PLC Designer«
42
M
MC-PBM Communication card
21
MC-PBM communication card
21
MC-PBM communication card, LED status displays
48
MC-PBS communication card
21
MC-PBS communication card, LED status displays
49
Mixed operation PROFIBUS with EtherCAT
43
N
Network topology
23
Number of nodes
19
O
Optimising the system
47
Index